How to Build a Winning Bid Strategy for Tier 2 Commercial Projects

Learn how Tier 2 commercial builders can win more tenders with a clear bid strategy, smart project selection, and strong non-price criteria.

Book Icon - Software Webflow Template
 min read
How to Build a Winning Bid Strategy for Tier 2 Commercial Projects

Tier 2 commercial projects in Australia and New Zealand sit in that sweet spot; big enough to need strong systems, but small enough that you’re competing against a handful of known players.
You’re not chasing every mega-government tender. You’re picking battles. And that’s where a smart, repeatable bid strategy can be the difference between winning and burning resources.

The truth? Most mid-sized commercial builders lose tenders not because their price is wrong, but because their bid package doesn’t tick every box the client cares about; clarity, compliance, capability, and confidence.

1. Start With the Right Opportunities

A winning bid strategy starts before you start estimating. Chasing every project that hits your inbox is a fast way to burn your pre-construction team out.

What to focus on:

  • Projects in your core sector (retail fitouts, aged care, education, industrial).
  • Locations where your supply chain is strong.
  • Clients who value capability over lowest price.
  • Jobs where you’ve got past performance proof.

2. Build a Pre-Bid Checklist

Before committing resources, have a checklist that answers:

  • Do we meet all mandatory compliance requirements?
  • Can we hit the timeline with current pipeline?
  • Do we have recent, relevant case studies?
  • Is our estimating team available to run this in detail?

This prevents the “we realised halfway through we’re not eligible” moment.

3. Price for Trust, Not Just for Win

Tier 2 projects are rarely awarded purely on lowest cost. Pricing too low can raise red flags; clients know it’ll lead to variations and delays. Instead:

  • Be transparent about inclusions and exclusions.
  • Back up your numbers with supplier quotes and realistic timelines.
  • Include allowances for risk factors (weather, material lead times).

4. Package the Bid Like a Project Manager Would

Most losing bids fail in the presentation, not the math. Your bid package is your first “project” for the client; show them how you’ll run the real thing.

Must-have sections in a professional bid package:

  • Executive summary that answers “Why you?”
  • Project understanding and methodology.
  • Detailed scope and inclusions.
  • Compliance documents (SWMS, permits, insurances).
  • Timeline with milestones.
  • Risk management plan.
  • Past project examples with metrics (on-time delivery, safety record).

5. Nail the Non-Price Criteria

Many Tier 2 tenders weight non-price criteria heavily; sometimes up to 40%. This is where you can stand out:

  • Safety track record: site incident rate, compliance audits.
  • Sustainability: waste management, energy efficiency.
  • Local content: subcontractor and supplier network.
  • Innovation: use of technology like Deep Space to manage the job.

6. Systemise the Process

If every bid feels like reinventing the wheel, you’re bleeding hours. Build:

  • Bid templates for consistent branding and compliance.
  • A central library of past project data.
  • Standard forms for subcontractor quotes and compliance docs.
  • A shared calendar for tender deadlines.

Deep Space clients often store all tender docs, supplier comms, and milestone tracking in one connected system so the estimating team, PMs, and site leads stay aligned.

7. Debrief Every Win and Loss

The fastest way to improve is to get feedback; whether you win or lose.

  • Ask clients for scoring breakdowns.
  • Identify recurring weak spots (design methodology, safety plans, presentation).
  • Update your templates and process accordingly.

Bottom Line

Winning Tier 2 commercial projects isn’t about chasing every opportunity. It’s about choosing the right jobs, presenting a clear plan, and showing the client you can deliver without chaos. A systemised bid strategy saves time, improves hit rates, and builds trust with repeat clients.


If you want to streamline your bid process and improve your win rate, book a Deep Space demo. See how Tier 2 builders are using one connected platform to manage tenders, track costs, and deliver projects on time.”

Newsletter - Software Webflow Template

Subscribe to our newsletter now!

Thanks for joining our newsletter.
Oops! Something went wrong.